Asphalt Shingles on Marine Plywood
& Still Roof Frame
WALL PARTITION
Fiber Cement on GI Sheet
Joist
FINISHES:
GROUND FLOOR
Ceramic Floor Tiles
BASEBOARD
Painted Wood Moulding
SECOND FLOOR
Polyurethine Finish Wood Parquet
CORNICE
Painted Wood Cornice
INTERIOR WALLS
Standard Rendered Paint
Finish
BATHROOM
1.5m High Ceramic tiles
EXTERIOR WALLS
Textured Paint Finish
KITCHEN CABINET
Melamine Prefab
CEILING
Flat-Latex White Paint
Finish
WARDROBE Closet
By Arrangement
WINDOWS :
Powder Coated white
Aluminum sliding windows
5 Blades Jalousie
for bathroom
Stell casement for
maids room
ELECTRICAL:
Complete
Elecrical Wiring (Luminaries not Included)
7 piece 1- gang switch
5 set Weather proof Outlet
2 piece 3-way switch
20 set Convenience Outlet
4 piece Aircon Outlet
5 piece 3 gang switch
4 piece Cable Outlet
4 piece 2-gang switch
6 piece Telephone Outlet
Stairs -
Wooden Staircase with On-painted Metal Railings
Water Supply
- Hot & Cold waterline (not included)
Fencing - 1.5 high 4" CBH
plaster finish at the back & back portion of Firewall;
0.2m high 4" CBH plaster finish @ at front and
side
Sanitary Line
- PVC Sanitary Pipe with 3m x 1.5 Septic Tank
Garage -
Long span GI sheets Roofing ; Reinforced Concrete Slab
(2 lengths 0.5m x 5m strip)
Plumbing Fixtures
- 3 sets Water Closet; 3 sets Lavatory; 3 sets Hot &
Cold Shower Faucet with Telephone Shower; 3 sets Soap
and Paper Holder; 6 sets 4"X4" Floor Drain;
1 Set Single Drain, Single Bowl Kitchen Sink; 1 set hot
and Cold Kitchen Faucet.